Complete electrical upgrade of Lerderderg Weir. Works included drawing template updates, switchboard manufacture and installation, temporary gate controls, replacement of all cabling, installation of field devices, FAT, SAT and documentation.
PROVE Infrastructure
We are engaged as the Electrical/Mechanical contractor for Diverseco to provide preventative and reactive maintenance services on the material handling system at the Hunter Express freight facility.
PROVE Infrastructure
Yarra Valley Water (YVW) appointed our team to perform an Electrical Condition Assessment on 130 of their sites. This project involved electrical testing, visual inspection, thermal imaging, RCD checks, drawing verification and asset data capture on high risk Sewage and Water pumping stations.
PROVE Infrastructure
PROVE Infrastructure has recently completed rectification works for Yarra Valley Water on more than 150 assets. The project involved minor and major works including test and tagging, labelling, drawing mark-ups, switchboard partitioning, replacement of critical electrical equipment, design and installation of custom machine guarding, etc. The project was completed using qualified technicians, fitters and fabricator
PROVE Infrastructure
As a sub-contractor to Underground Pump Supplies, PROVE Infrastructure provided labour services in replacing two new progressive cavity pumps at Ballarat Sewage Treatment Plant. The team successfully installed the two new pumps, stainless pipework and valving within what was a very tight time frame. The project was recognised and complemented by the Engineers and Plant [...]
PROVE Infrastructure
PROVE Infrastructure director, Frank Iapozzuto provided Yarra Valley Water a cost effective alternative to manage the unique pump blockages that were occurring at SPS639. Frank hand-picked a select task team which was formed to assist in providing a solution to this high lift pump station in order to reduce the huge ongoing monthly costs due to pump blockages. The project included investigation, research, consultancy, design, procurement
PROVE Infrastructure
As high level zones require full time pumping PROVE Infrastructure director, Frank Iapozzuto and Underground Pump Supplies were engaged to provide functional, preliminary and final design for WPS078. The project involved delivering full mechanical and electrical designs which incorporated the innovative use of 5 x vertical multistage pumps. The station successfully caters for the low flow, normal and for emergency