
PROVE Infrastructure
PROVE Infrastructure director, Frank Iapozzuto provided Yarra Valley Water a cost effective alternative to manage the unique pump blockages that were occurring at SPS639. Frank hand-picked a select task team which was formed to assist in providing a solution to this high lift pump station in order to reduce the huge ongoing monthly costs due to pump blockages. The project included investigation, research, consultancy, design, procurement