Project Description

PROVE Infrastructure director, Frank Iapozzuto provided Yarra Valley Water a cost effective alternative to manage the unique pump blockages that were occurring at SPS639.  Frank hand-picked a select task team which was formed to assist in providing a solution to this high lift pump station in order to reduce the huge ongoing monthly costs due to pump blockages.  The project included investigation, research, consultancy, design, procurement, installation and commissioning.

The success of the job was a testament to our skills and ability to deliver innovative and cost effective solutions.